Publicity of environmental impact assessment on 300t PTA catalyst unit of BASF PGM expansion project issued by: Shanghai Research Institute of Chemical Industry issued on: april19,2012 Environmental impact assessment of 300 t/a PTA catalyst unit of PGM unit expansion project of BASF Chemical Co., Ltd. after the test. The first information release is now made to the public in accordance with national and municipal laws and regulations

BASF Chemical Co., Ltd. and Shanghai Research Institute of chemical industry are responsible for the authenticity of the information released at this stage. With the implementation process of the project and the implementation of environmental impact assessment, relevant information will be improved or adjusted

2. Overview of the construction project

2.1 project name: PGM plant expansion project of BASF Chemical Co., Ltd. -300 T/a PTA catalyst unit

2.2 project location: BASF Chemical Co., Ltd. E1 plot, No. 8 Chuhua Road, Shanghai Chemical Industry Zone

2.3 project industry: manufacturing of special chemicals

2.4 project content:

BASF chemical Co., Ltd. plans to build PTA catalyst production line in the existing plant, The annual production capacity is 300t/acba300 and cba400. The project covers an area of 127.5m2 and the total investment is about 10.76 million yuan

the process mainly includes the production, washing and packaging of sodium chloroparadate solution preparation, soaking solvent preparation, reducing solvent preparation and low concentration of catalyst industry

3. Overview of the construction unit

(1) name of the construction unit: BASF Chemical Co., Ltd.

(2) contact address of the construction unit: No. 8, Chuhua Road, Shanghai Chemical Industry Zone

(3) contact person of the construction unit: Mr. Liu

(4) contact information of the construction unit:

4 Summary of the evaluation organization

(1) name of the evaluation organization: Shanghai Research Institute of chemical industry

(2) Certificate No.: EIA Zheng Jia Zi No. 1806

(3) mailing address: Building 8, 345 Yunling East Road, Putuo District, Shanghai

(4) contact person: Mr. Zhu

(5) contact method: transfer to 1686

Fax:; E-mail:sricieia@

5. Environmental impact assessment procedures and main work contents

main procedures of environmental impact assessment: on the basis of verifying project data and determining project discharge sources, combined with the environmental status and environmental protection objectives of the construction area, analyze the degree and scope of environmental impact of the project and evaluate the feasibility of project construction; Put forward requirements and suggestions for environmental protection measures in combination with national environmental protection policies and regulations, public opinions and environmental impact analysis results

the main contents of environmental impact assessment include: investigation of local environmental quality status, engineering analysis, cleaner production analysis, environmental impact prediction and assessment, environmental risk assessment, pollution prevention and control countermeasure analysis, public participation, environmental management and monitoring plan, environmental impact economic profit and loss analysis, planning compatibility analysis, total amount control, etc

6. Main matters for soliciting public opinions

(1) contents for soliciting public opinions

1) public opinions on the environmental quality of the area where the project construction site is located, and what main environmental problems they think exist

2) public understanding of the project

3) environmental protection issues mainly concerned by the public during project construction and operation

4) public attitude towards the construction of the project

5) public opinions or suggestions on environmental protection measures and environmental management during the construction of the project

(2) place and method of publicity

this publicity is the first information disclosure of environmental impact assessment, and it is publicized at Shanghai environmental station. At the later stage of the EIA, the second information disclosure will be carried out and public opinions will be further solicited

7. Main ways for the public to put forward opinions

the public can send e-mails, faxes and letters to the construction unit and the evaluation organization. Corrugated tensile clamps: 60mm wide and 50mm high, 1 set/2 pieces, etc. to express their opinions on the construction and environmental assessment of the project (no issues unrelated to environmental protection will be accepted)

please leave your name and basic information (company or address, education level, occupation, contact information, etc.) when giving comments, so as to make a return visit when necessary

8. The effective period of information release is 10 days from the release of this information

note: in this reprint, you need to wait for 1 minute before restarting. The source of the content is indicated. The reprint is for the purpose of transmitting more information, and does not mean that you agree with their views or confirm the authenticity of their contents

Copyright © 2011 JIN SHI